ACA Could use your help with the following summer work projects:
- Windows in doors of all classrooms
- New door in 3rd/4th grade room (door/window combo from library area if possible)
- Put in window between computer lab and library.
- Put board on playground fort
- Remove fence & gate in driveway and add parking spaces
- Beautify the annex
- Paint all restrooms (frames around paintings, maybe with plexiglass, to preserve them)
- Paint stalls in restrooms where needed
- Touch up paint in auditorium and hallways
- Paint windows in upstairs hallways
- Re-carpet stairs in library
- Set up science lab
- Weather strip for steel door
- Replace ceiling tiles in closets and auditorium
- Repair toilet paper holder in boy’s restroom upstairs
- Repair black chain link fence – re-attach cross pipe
- Put baseboard in computer lab, Mrs. Miller’s room, and library
- Replace tile in back stairwell
- Repair wall in back stairwell
- Put closing mechanism on back stairwell doors (upstairs and downstairs)
- Lettering on top of building
- Multipurpose sports field with backstop and benches
- Shed for sports equipment
- Storage building for costumes
- Front school sign
- Two ACA street signs
- One or two-One way do not enter signs
- Carpet great room
- Redo halls
- Build library desk and shelves
- Get library area rugs
- Stain and repair playground equipment
- Replace or repair tetherball
- Re-stripe parking area by annex
- Car Pool Map
- Marketing Brochure, CDs, logos, letterhead
- Upgrade sprinkler system
- Add security door lock system, and door closer
- Make a room for Mrs. Brewer
If you are interested in volunteering your time or services please contact the school secretary at davisb@acatulsa.org
{$comments}
The Charger
The Charger
The Charger
The Charger
Learning About Israel
Winter Court 2010
The Charger
'Seven Brides for Seven Brothers'
The Charger
The Charger
Winter Court Postponed
Singing Valentines
The Charger
Order Yearbooks Online!